Floor sheeting went on quickly!

The roof is sheeted! Woohoo!

Siding and cement work have begun! 

Federated Insurance Team Builds! They hung the kitchen and dining room and finished the bathroom! Thanks crew!

The Chambers Family

And then there were walls!

Ty-vek went on quickly! Millersberg Construction got the shingles on in half a day!

Styrofoam and sill seal is all complete!

Sheetrock has started to be hung!

The footings have been molded and block is ready to be set!

Thanks to some great help from Good Shepherd, participating in "Gods work, our hands", the garage is framed!

After some heavy lifting, the roof was in place!

With the help of Federated Insurance Interns, we were able to install all joist hangers and finish the blocking!

A great group volunteered for World Habitat Day! What an awesome day!

Plumbing has been installed. Donated material from Uponor helped save on cost!

With the help of Trinity Lutheran Church, groundbreaker went on and drain tile was installed!

Floor joists have been set!

A group of Owatonna School District Administrators helped us hang siding!

A group from Choice Technical Academies helped us haul in massive amounts of sheetrock.

The groundbreaking was a huge success. The shovels donated by Bommgars were the perfect size for these kiddos.

The Lot has been picked and cleared!

563 Glendale Street

​Owatonna, MN

Track the Progress

Owatonna 2017